Ready mix concrete delivery and placement
Ready mix concrete is concrete that is manufactured in a batching plant and delivered to a construction site in a mixer lorry, ready for immediate use. The process involves several stages, from ordering the correct grade of concrete to the final pour and placement. This article covers the typical steps involved in receiving and placing ready mix concrete on a construction site, including site preparation, delivery logistics, and the pour itself.
Ordering and delivery planning
The first stage of a ready mix concrete pour begins before any concrete arrives. The contractor must determine the required grade of concrete, such as C10 for non-structural applications or C40 for heavy-duty industrial floors, and place an order with a supplier. The supplier then allocates a delivery slot, which is a scheduled time window for the mixer lorry to arrive at the site. This slot must account for travel time from the plant to the site, as well as any traffic or access constraints.
Delivery planning also involves coordinating the number of mixer lorries needed. For a large pour, multiple loads may arrive in sequence, often called a continuous pour. The contractor must ensure that the site is ready to receive the concrete without delays, as the concrete begins to set within a few hours of batching. Any delay can cause the concrete to stiffen before it is placed, leading to weak spots or a failed pour.
Site preparation
Before the mixer lorry arrives, the pour location must be prepared. This includes setting up formwork to shape the concrete, placing reinforcement such as steel rebar or mesh, and ensuring the ground is properly compacted and level. The access route for the mixer lorry must be checked for width, height, and weight restrictions. If the lorry cannot reach the discharge point directly, alternative methods such as wheelbarrows or a concrete pump must be arranged.

Traffic management may be required if the site is near a public road or if the pour involves a large number of vehicles. This ensures that the mixer lorries can enter and exit safely, and that the concrete can be discharged without interruption. The contractor should also have a plan for disposing of any washout water from the mixer lorry, as it contains cement and aggregate that must not enter drains or watercourses.
The pour process
When the mixer lorry arrives, it reverses into position at the discharge point. The driver checks the delivery ticket to confirm the grade and volume of concrete, and the contractor or site supervisor inspects the concrete for consistency and workability. The concrete is then discharged through a chute or into a concrete pump hopper. The ready mix concrete pour process begins as the concrete flows into the formwork, either directly from the lorry or via a pump line.
During the pour, workers spread and level the concrete using shovels, rakes, and sometimes a vibrating screed to remove air pockets. For slabs, a bull float or power trowel is used to smooth the surface. The concrete must be placed within the time limit set by the supplier, typically within two hours of batching, to ensure it does not begin to set before it is compacted. The ready mix concrete pour process continues until the required volume is placed, at which point the lorry departs and the finishing stage begins.
Discharge methods
Direct discharge from the chute is the simplest method and works when the pour location is close to the lorry. For sites with limited access, a concrete pump is used to move the concrete through a hose to the pour location. Wheelbarrows are another option for small pours or tight spaces, though they require more labour and time. The choice of method depends on the site layout, the volume of concrete, and the time available.
Finishing and curing
Once the concrete is placed, it must be finished to achieve the desired surface texture. For floors, this may involve power trowelling to create a smooth finish. For exposed aggregate finishes, the surface is washed and brushed. The concrete then enters the curing stage, during which it gains strength over several days. Curing involves keeping the concrete moist and at a stable temperature, often by covering it with plastic sheeting or applying a curing compound.

The quality of the finished concrete depends on the entire process, from the correct order placement to the final curing. Proper site preparation, careful timing of deliveries, and skilled placement all contribute to a durable and long-lasting concrete structure. Any mistakes in the pour process can lead to defects such as cracking, honeycombing, or low strength, which are costly to repair.
Common challenges
Several issues can arise during a ready mix concrete pour. A common problem is a delay in the arrival of the mixer lorry, which can cause the concrete to stiffen before it is placed. Another challenge is uneven access, where the lorry cannot reach the discharge point and alternative methods are not prepared. Weather also plays a role; hot weather accelerates setting, while cold weather slows it down and may require heated concrete or insulation.
In some cases, the site may have poor ground conditions that cause the formwork to shift during the pour. This can be prevented by thorough site preparation and using proper supports. Communication between the contractor, the supplier, and the driver is essential to avoid these problems. A well-planned pour runs smoothly and produces a strong, uniform concrete slab or structure.
Safety considerations
Safety is an important aspect of any concrete pour. Workers must wear appropriate personal protective equipment, including gloves, boots, and eye protection. The area around the discharge point should be kept clear of debris and trip hazards. When using a concrete pump, the hose and boom must be handled carefully to avoid injury. The mixer lorry itself presents risks due to its size and the weight of the load, so workers should stay clear of the reversing zone and the chute area.
Washout water from the mixer lorry must be collected and disposed of according to local regulations. Cement in the washout water is highly alkaline and can harm aquatic life if it enters waterways. Many suppliers provide washout facilities or require the contractor to have a containment system in place.

Environmental impact
The production and delivery of ready mix concrete have environmental implications, mainly from the energy used in cement manufacture and the fuel consumed by mixer lorries. Contractors can reduce the impact by ordering only the required volume, planning efficient delivery routes, and using supplementary cementitious materials where appropriate. Some suppliers offer concrete with lower carbon footprints, such as those using ground granulated blast furnace slag or fly ash as partial cement replacements.
Waste concrete from a pour should be minimised, as it often ends up in landfill. Leftover concrete can sometimes be used for other projects or returned to the plant for recycling. Washout water must be contained and treated, as mentioned earlier. These practices help reduce the environmental footprint of a concrete pour while still providing a strong, durable construction material.