Main phases of repair in the house 92292

From Qqpipi.com
Revision as of 04:54, 27 August 2025 by Gobnatggdw (talk | contribs) (Created page with "<html><p> Main phases of repair in the apartment.</p><p> </p>How to begin repair works of the apartment?<p> </p>The first phase of the repair of old homes is the damage and taking apart to start with of the worn out walls and partition walls, removing the wall and ceiling finish. This stage is one of the most "unclean" stages of the repair. <p> </p>One more among the most essential and "dusty" works is the window block replacement. It is essential to do this first off be...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Main phases of repair in the apartment.

How to begin repair works of the apartment?

The first phase of the repair of old homes is the damage and taking apart to start with of the worn out walls and partition walls, removing the wall and ceiling finish. This stage is one of the most "unclean" stages of the repair.

One more among the most essential and "dusty" works is the window block replacement. It is essential to do this first off because dirt and dust will be unallowable throughout following phases and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to load them immediately in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to top-notch plumbing service avoid scratches).

The following stage is circuitry. Wiring can be set up in walls or along the flooring. Circuitry is made inside the pipes to make sure electrical safety and boost reliability. The pipe secures wiring from external damages and allows to change the wire entirely without breaking walls and flooring merely by inserting the new wire rather of the old one.

House Painting follows the electrical wiring. The regular error throughout the simultaneous conducting of such works happens when employees forget to set out one of the cable televisions and home painters have actually already plastered and smoothed out the wall. As an outcome, extra works are essential to seal goes after on the completed wall. The locations of the feed switch and wall outlet area and their number must be thought-out beforehand. The plan of power electrical wiring is usually included into the design project.

Later on the system should be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are set out. The power cable television must not be laid out near the telephone and antenna cable televisions to avoid sound pickup and disturbance. The most strange moment is laying out the television cable. In order to make 2 (or three) TV sets in the house the second cable television is often merely "strongly soldered" in parallel, so the cable resistance is decreased. As an outcome, the screen quality is weakened, lots of programs can't be received and etc. In order to prevent such scenario it is necessary to invite a professional with unique equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting process, that is why it is conducted simultaneously in all facilities, if it is possible. Delays are linked with the technology. Each applied layer of the plaster (or filling out finishing) should dry entirely before the work will continue.

Works in sanitary plans and the kitchen area begin simultaneously with home painting. It is better to fulfill so-called "filthy" operate in the top place and concurrently. In accordance with the strategy of the hygienic service technician location welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and reliable top plumbers brackets are mounted, but radiators are not installed.

Then operates in sanitary arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and devices are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed during this stage in order to save their surface area look. The finish puttying of walls is conducted all at once. The technologically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that measures wetness of the material.

The following stage is the process of fill. Fill can be made with different materials-- from typical masonry cement-sand mix to self-aligning floors. The benefit of the basic mix is its cheapness, the disadvantage is that such mixture is much more difficult lined up at the level and the final dry time of such fill is 40 days, just then the next stage of the work with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floorings are far more expensive, but more technological. Aligning takes place practically "automatically" i.e. fluid service of mixture is put out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm floor" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry lining up (the fill technology) is used bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Installation of doors need to take into the account density of future flooring covering. After setup the door can be removed its hinges and removed up until the end of repair work or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the definitely dry overlay.

Finishing of the floor installing depends upon the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.

In properties where surface covering of the flooring is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned effect is connected only with such rushing process when the fantastic amount of dust is developed. In spite of the fact that excellent floor mills are equipped with the vacuum, the enough quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is very acerbic and is severely washed off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be completed. It is left just to install the plinths, ornamental components, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to keep in mind that the sequence of works was noted in basic and can alter depending on the definite situation-- the variety of spaces in property, your resources, peculiarities of the building of the multilevel premises. It is based upon sound judgment and every person efficient in analysis can separately create such a sequence.