Revision as of 21:41, 18 August 2025 by Ceachelbbf (talk | contribs) (Created page with "<html><p> Main phases of repair works in the apartment.</p><p> </p>How to start repair <a href="https://touch-wiki.win/index.php/Opening_your_dungeon_how_to_finish_a_basement_without_ending_up">top-rated plumber near me</a> works of the apartment?<p> </p>The very first phase of the repair of old houses is the damage and taking apart first of all of the shabby walls and partition walls, removing the wall and ceiling finish. This stage is among the most "unclean" phases of...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Main phases of repair works in the apartment.

How to start repair top-rated plumber near me works of the apartment?

The very first phase of the repair of old houses is the damage and taking apart first of all of the shabby walls and partition walls, removing the wall and ceiling finish. This stage is among the most "unclean" phases of the repair work.

One more among the most crucial and "dirty" works is the window block replacement. It is needed to do this firstly since dirt and dust will be unallowable during following phases and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is necessary to load them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following phase is electrical wiring. Circuitry can be set up in walls or along the flooring. Wiring is made inside the pipes to make sure electrical security and boost reliability. The pipeline secures wiring from external damages and enables to change the wire totally without breaking walls and flooring just by placing the brand-new wire rather of the old one.

House Painting follows the circuitry. The frequent error during the simultaneous conducting of such works takes place when employees forget to set out among the cables and home painters have currently plastered and smoothed out the wall. As a result, extra works are necessary to seal goes after on the ended up wall. The locations of the feed switch and wall outlet area and their number should be thought-out ahead of time. The plan of power wiring is typically consisted of into the design project.

Later on the system should be all set to service in case of failures. In addition to the electrical wirings, the telephone cable and the TV cable are set out. The power cable need to not be set out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most strange moment is laying out the TV cable. In order to make 2 (or 3) television set in the apartment or condo the second cable television is often merely "securely soldered" in parallel, so the cable resistance is decreased. As an outcome, the display quality is weakened, many programs can't be received and etc. In order to avoid such situation it is essential to welcome a specialist with special devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is conducted all at once in all properties, if it is possible. Delays are linked with the innovation. Each used layer of the plaster (or completing ending up) need to dry totally before the work will continue.

Works in hygienic arrangements and the cooking area start all at once with home painting. It is better to meet so-called "unclean" operate in the first place and simultaneously. In accordance with the plan of the hygienic technician place welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in sanitary plans are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and accessories are mounted.

After wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface area look. The finish puttying of walls is conducted simultaneously. The technologically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the procedure of fill. Fill can be made reliable top plumbers with different products-- from normal masonry cement-sand mix to self-aligning floorings. The advantage of the basic mix is its cheapness, the downside is that such mixture is much harder lined up at the level and the last dry time of such fill is 40 days, only then the next phase of the work with floor can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are far more costly, but more technological. Lining up occurs nearly "immediately" i.e. fluid option of mixture is poured out, then it runs and you get the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "wet processes" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Setup of doors should take into the account thickness of future floor covering. After setup the door can be taken off its hinges and removed till the end of repair or loaded into polyethylene film to secure from damages. All at once ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile must be laid on the definitely dry overlay.

Finishing of the flooring mounting depends upon the prepared covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.

In properties where surface covering of the flooring is laminated floor covering or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out repercussion is connected only with such rushing process when the excellent quantity of dust is created. In spite of the reality that excellent flooring grinders are equipped with the vacuum, the adequate quantity of dust is sped up on surrounding topics consisting of walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be completed. It is left only to install the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is needed to note that the sequence of works was noted in basic and can change depending upon the definite circumstance-- the number of spaces in property, your resources, peculiarities of the building of the multilevel premises. It is based upon common sense and every person efficient in analysis can independently produce such a series.