Created page with "<html><p> Main stages of repair works in the apartment.</p><p> </p>How to begin repair works of the apartment?<p> </p>The very first stage of the repair of old apartments is the destruction and dismantling first off of the worn out walls and partition walls, eliminating the wall and ceiling finishing. This phase is among the most "filthy" phases of the repair. <p> </p>One more amongst the most crucial and "dirty" works is the window block replacement. It is needed to do..."
 
(No difference)

Latest revision as of 23:45, 7 August 2025

Main stages of repair works in the apartment.

How to begin repair works of the apartment?

The very first stage of the repair of old apartments is the destruction and dismantling first off of the worn out walls and partition walls, eliminating the wall and ceiling finishing. This phase is among the most "filthy" phases of the repair.

One more amongst the most crucial and "dirty" works is the window block replacement. It is needed to do this first off since dirt and dust will be unallowable throughout following phases and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature and wetness are unallowable). After installing windows and windowsills it is essential to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following stage is electrical wiring. Circuitry can be installed in walls or along the flooring. Wiring is made inside the pipelines to ensure electrical safety and increase reliability. The pipe secures wiring from external damages and permits to replace the wire completely without breaking walls and floor simply by placing the brand-new wire instead of the old one.

House Painting follows the wiring. The regular error during the simultaneous conducting of such works occurs when employees forget to set out one of the cables and house painters have currently plastered and ravelled the wall. As a result, additional works are essential to seal chases after on the ended up wall. The places of the feed switch and wall outlet area and their number must be thought-out ahead of time. The scheme of power electrical wiring is usually consisted of into the design project.

Later on the system must be all set to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable television are laid out. The power cable must not be laid out near the telephone and antenna cable televisions to prevent sound pickup and interference. The most strange minute is setting out the television cable television. In order to make two (or 3) TV sets in the house the 2nd cable is frequently just "strongly soldered" in parallel, so the cable television resistance is lowered. As a result, the display screen quality is weakened, lots of programs can't be received and etc. In order to avoid such scenario it is essential to invite a specialist with special devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is conducted concurrently in all properties, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or filling out finishing) should dry completely before the work will continue.

Works in hygienic arrangements and the kitchen begin at the same time with house painting. It is better to fulfill so-called "dirty" operate in the first place and concurrently. In accordance with the strategy of the hygienic professional place welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in sanitary plans are performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and quality plumbing service breakers are not set up throughout this phase in order to save their surface look. The surface puttying of walls is performed simultaneously. The technologically specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that measures moisture of the material.

The following stage is the procedure of fill. Fill can be made with various materials-- from usual masonry cement-sand mixture to self-aligning floorings. The advantage of the simple mix is its cheapness, the disadvantage is that such mixture is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next phase of the deal with flooring can be conducted, i.e. the duration is too long. Self-leveling self-aligning floors are a lot more costly, however more technological. Aligning takes place practically "automatically" i.e. fluid solution of mixture is poured out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are installed. Installation of doors must take into the account density of future flooring covering. After installation the door can be removed its hinges and removed till the end of repair or packed into polyethylene film to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that properties where it was prepared. The tile must be laid on the absolutely dry overlay.

Finishing of the flooring mounting depends upon the planned covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

In premises where surface covering of the flooring is laminated floor covering or parquet hoard, the regular wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned consequence is connected just with such scrambling procedure when the excellent quantity of dust is developed. In spite of the truth that good flooring grinders are equipped with the vacuum, the adequate quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be ended up. It is left just to install the plinths, decorative elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is needed to keep in mind that the sequence of works was listed in general and can alter depending upon the definite scenario-- the variety of rooms in property, your resources, peculiarities of the building of the multilevel properties. It is based upon common sense and everyone capable of analysis can individually develop such a series.