Main phases of repair works in the house 93989
Main phases of repair works in the apartment.
How to start repair works of the apartment?
The first stage of the repair of old homes is the destruction and taking apart firstly of the dilapidated walls and partition walls, removing the wall and ceiling coating. This stage is one of the most "filthy" phases of the repair work.
One more amongst the most important and "dirty" works is the window block replacement. It is needed to do this first of all due to the fact that dirt and dust will be unallowable throughout following phases and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature and wetness are unallowable). After mounting windows and windowsills it is essential to pack them immediately in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).
The following stage is circuitry. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipelines to make sure electrical security and increase dependability. The pipeline protects electrical wiring from external damages and permits to change the wire totally without breaking walls and floor merely by placing the brand-new wire instead of the old one.
House Painting follows the wiring. The regular mistake throughout the simultaneous conducting of such works takes place when workers forget to set out among the cable televisions and house painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are needed to seal chases after on the finished wall. The places of the feed switch and wall outlet area and their number must be thought-out in advance. The plan of power wiring is usually included into the design project.
Later on the system must be all set to service in case of failures. In addition to the circuitries, the telephone cable and the television cable are set out. The power cable need to not be set out near the telephone and antenna cable televisions to avoid noise pickup and trusted top plumbers disturbance. The most peculiar minute is setting out the TV cable. In order to make two (or 3) television set in the apartment the second cable television is frequently merely "strongly soldered" in parallel, so the cable resistance is lowered. As an outcome, the display quality is weakened, numerous programs can't be gotten and etc. In order to avoid such scenario it is needed to invite a specialist with unique equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is performed concurrently in all premises, if it is possible. Hold-ups are linked with the innovation. Each used layer of the plaster (or filling out finishing) need to dry entirely before the work will continue.
Works in hygienic plans and the kitchen begin simultaneously with home painting. It leading plumbing company is better to fulfill so-called "dirty" works in the first place and all at once. In accordance with the strategy of the hygienic professional place welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then works in sanitary plans are performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.
After electrical wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface area look. The finish puttying of walls is conducted at the same time. The technologically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.
The following stage is the process of fill. Fill can be made with different materials-- from usual masonry cement-sand mix to self-aligning floorings. The advantage of the simple mixture is its cheapness, the downside is that such mixture is much harder aligned at the level and the final dry time of such fill is 40 days, only then the next phase of the deal with flooring can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more costly, however more technological. Lining up happens practically "immediately" i.e. fluid option of mix is put out, then it runs and you get the horizontal surface area. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is installed into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry aligning (the fill technology) is used bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Setup of doors must take into the account thickness of future flooring covering. After setup the door can be removed its hinges and eliminated till completion of repair work or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid top plumbing company in that facilities where it was prepared. The tile must be laid on the absolutely dry overlay.
Finishing of the floor installing depends on the prepared covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close repairing of plywood and long-term service of the flooring without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In properties where surface covering of the flooring is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned effect is connected only with such rushing process when the terrific amount of dust is developed. In spite of the truth that great flooring mills are equipped with the vacuum, the enough quantity of dust is precipitated on surrounding subjects including walls. Dust is very acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be finished. It is left just to set up the plinths, ornamental aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is needed to note that the sequence of works was listed in basic and can change depending on the definite circumstance-- the number of spaces in property, your resources, peculiarities of the building and construction of the multilevel properties. It is based upon sound judgment and every person efficient in analysis can individually create such a series.