Main stages of repair in the apartment.

How to begin repair works of the apartment?

The first phase of the repair of old homes is the damage and taking apart firstly of the shabby walls and partition walls, eliminating the wall and ceiling coating. This stage is among the most "dirty" phases of the repair.

One more among the most important and "dusty" works is the window block replacement. It is essential to do this first off because dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows throughout painting and wallpaper works (large drops of the temperature and wetness are unallowable). After mounting windows and windowsills it is essential to load them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following stage is electrical wiring. Wiring can be installed quality best plumber in walls or along the floor. Wiring is made inside the pipes to ensure electrical safety and boost dependability. The pipe safeguards electrical wiring from external damages and permits to change the wire entirely without breaking walls and flooring just by inserting the brand-new wire rather of the old one.

House Painting follows the wiring. The regular mistake throughout the simultaneous conducting of such works takes place when workers forget to set out among the cables and home painters have already plastered and smoothed out the wall. As a result, additional works are required to seal chases after on the completed wall. The places of the feed switch and wall outlet place and their number must be thought-out beforehand. The plan of power circuitry is typically consisted of into the style project.

Later on the system must be ready to service in case of failures. In addition to the electrical wirings, the telephone cable and the TV cable are set out. The power cable need to not be laid out near the telephone and antenna cable televisions to prevent noise pickup and interference. The most strange moment is setting out the TV cable. In order to make 2 (or three) TV sets in the apartment or condo the second cable television is typically just "firmly soldered" in parallel, so the cable resistance is lowered. As an outcome, the screen quality is degraded, lots of programs can't be gotten and etc. In order to avoid such scenario it is essential to welcome an expert with special devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted all at once in all facilities, if it is possible. Hold-ups are linked with the innovation. Each used layer of the plaster (or completing completing) need to dry entirely before the work will continue.

Works in hygienic plans and the cooking area start concurrently with home painting. It is much better to meet so-called "filthy" works in the first place and simultaneously. In accordance with the strategy of the hygienic service technician location welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then operates in hygienic arrangements are carried out trusted top plumbers according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and accessories are mounted.

After wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to conserve their surface area look. The finish puttying of walls is conducted simultaneously. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures moisture of the material.

The following stage is the procedure of fill. Fill can be made with various products-- from typical masonry cement-sand mix to self-aligning floorings. The advantage of the simple mix is its cheapness, the downside is that such mixture is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next phase of the work with flooring can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more pricey, however more technological. Aligning occurs almost "instantly" i.e. fluid service of mixture is poured out, then it runs and you get the horizontal surface area. The last dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After installation the door can be removed its hinges and got rid of up until completion of repair or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid in that properties where it was planned. The tile must be laid on the absolutely dry overlay.

Finishing of the flooring installing depends upon the planned covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

In properties where finish covering of the floor is laminated flooring or parquet stockpile, the regular wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned repercussion is connected only with such rushing procedure when the great quantity of dust is produced. In spite of the fact that great flooring grinders are equipped with the vacuum, the sufficient quantity of dust is precipitated on surrounding topics including walls. Dust is extremely acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be finished. It is left just to set up the plinths, decorative elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to note that the series of works was noted in basic and can change depending upon the certain circumstance-- the variety of spaces in property, your resources, peculiarities of the building of the multilevel premises. It is based upon common sense and every person capable of analysis can independently produce such a sequence.