Main phases of repair in the house 27752
Main phases of repair works in the apartment.
How to begin repair works of the apartment?
The very first phase of the repair work of old apartments is the destruction and dismantling first of all of the shabby walls and partition walls, getting rid of the wall and ceiling finishing. This phase is among the most "dirty" stages of the repair work.
One more among the most essential and "dirty" works is the window block replacement. It is essential to do this firstly because dirt and dust will be unallowable throughout following phases and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is required to load them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).
The following phase is wiring. Circuitry can be set up in walls or along the flooring. Electrical wiring is made inside the pipelines to guarantee electrical security and boost reliability. The pipeline protects wiring from external damages and enables to change the wire entirely without breaking walls and flooring merely by placing the new wire instead of the old one.
House Painting follows the circuitry. The regular error during the synchronised conducting of such works occurs when workers forget to lay out one of the cables and house painters have actually already plastered and ravelled the wall. As a result, extra works are needed to seal chases on the ended up wall. The locations of the feed switch and wall outlet location and their number should be thought-out in advance. The scheme of power circuitry is usually included into the style project.
Later on the system need to be ready to service in case of failures. In addition to the circuitries, the telephone cable television and the TV cable television are set out. The power cable television should not be set out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most strange minute is laying out the television cable television. In order to make two (or 3) television set in the house the second cable is frequently merely "securely soldered" in parallel, so the cable television resistance is decreased. As a result, the display screen quality is weakened, lots of programs can't be gotten and etc. In order to prevent such scenario it is required to welcome a professional with special devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed concurrently in all properties, if it is possible. Hold-ups are related to the technology. Each used layer of the plaster (or filling in completing) need to dry completely before the work will continue.
Works in sanitary plans and the cooking area begin concurrently with home painting. It is better to satisfy so-called "dirty" works in the top place and at the same time. In accordance with the plan of the hygienic specialist area welding, wall chasing and pipeline run are carried out. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary arrangements are performed according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and accessories are mounted.
After electrical wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this stage in order to save their surface area look. licensed Cranbourne plumber The finish puttying of walls is performed all at once. The technically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that measures moisture of the material.
The following phase is the process of fill. Fill can be made with various products-- from typical masonry cement-sand mix to self-aligning floorings. The benefit of the simple mixture is its cheapness, the disadvantage is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next phase of the deal with flooring can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are far more expensive, but more technological. Aligning happens practically "automatically" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry lining up (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors need to take into the account thickness of future floor covering. After setup the door can be removed its hinges and got rid of till completion of repair or packed into polyethylene film to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the absolutely dry overlay.
Finishing of the flooring installing depends upon the planned covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.
In premises where finish covering of the floor is laminated floor covering or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is connected only with such scrambling process when the excellent quantity of dust is developed. In spite of the fact that great flooring grinders are equipped with the vacuum, the enough amount of dust is sped up on surrounding subjects including walls. Dust is really acerbic and is severely washed off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be ended up. It is left only to set up the plinths, decorative components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to note that the series of works was noted in general and can change depending on the certain circumstance-- the number of rooms in property, your resources, peculiarities of the building and construction of the multilevel properties. It is based on good sense and everyone efficient in analysis can separately create such a series.