Main phases of repair in the apartment or condo 33118
Main phases of repair works in the apartment.
How to start repair of the apartment?
The very first phase of the repair of old apartments is the damage and dismantling first of all of the dilapidated walls and partition walls, removing the wall and ceiling finishing. This phase is among the most "filthy" stages of the repair.
One more among the most crucial and "dirty" works is the window local best plumber block replacement. It is required to do this first off because dirt and dust will be unallowable during following stages and it is prohibited at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to pack them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following stage is circuitry. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipelines to guarantee electrical security and boost reliability. The pipe safeguards wiring from external damages and enables to replace the wire entirely without breaking walls and floor simply by placing the brand-new wire rather of the old one.
House Painting follows the electrical wiring. The frequent error throughout the synchronised conducting of such works occurs when employees forget to lay out one of the cable televisions and house painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are essential to seal chases on the ended up wall. The places of the feed switch and wall outlet place and their number should be thought-out beforehand. The plan of power wiring is typically included into the style project.
Later on the system must be ready to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are set out. The power cable television must not be laid out near the telephone and antenna cables to avoid sound pickup and disturbance. The most peculiar minute is laying out the television cable. In order to make 2 (or three) television set in the apartment the second cable television is often merely "strongly soldered" in parallel, so the cable television resistance is lowered. As an outcome, the display screen quality is deteriorated, lots of programs can't be gotten and etc. In order to avoid such scenario it is essential to invite a professional with special equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is conducted simultaneously in all properties, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or completing ending up) need to dry entirely before the work will continue.
Works in hygienic arrangements and the kitchen begin at the same time with home painting. It is better to satisfy so-called "unclean" operate in the top place and concurrently. In accordance with the plan of the sanitary specialist area welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then works in hygienic arrangements are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.
After wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this phase in order to save their surface appearance. The finish puttying of walls is performed all at once. The technologically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.
The following stage is the process of fill. Fill can be made with different products-- from typical masonry cement-sand mix to self-aligning floorings. The advantage of the easy mix is its cheapness, the drawback is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next stage of the work with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floors are far more pricey, but more technological. Aligning takes place practically "instantly" i.e. fluid option of mixture is poured out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is installed into the fill. If the so-called "wet processes" are inapplicable the technology of the dry aligning (the fill innovation) is used bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Installation of doors must take into the account thickness of future flooring covering. After setup the door can be removed its hinges and got rid of until completion of repair work or packed into polyethylene film to safeguard from damages. Concurrently ceiling can be painted and the tile can be laid in that properties where it was prepared. The tile must be laid on the absolutely dry overlay.
Finishing of the floor installing depends upon the planned covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated flooring or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is connected just with such scrambling process when the great quantity of dust is developed. In spite of the fact that excellent flooring mills are geared up with the vacuum cleaner, the enough amount of dust is precipitated on surrounding subjects consisting of walls. Dust is really acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be ended up. It is left only to install the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the series of works was listed in basic and can alter depending on the definite situation-- the number of rooms in property, your resources, peculiarities of the building and construction of the multilevel properties. It is based upon good sense and every person capable of analysis can independently create such a series.