Main phases of repair in the apartment or condo 15776
Main phases of repair works in the apartment.
How to start repair works of the apartment?
The first phase of the repair work of old apartments is the destruction and taking apart firstly of the shabby walls and partition walls, removing the wall and ceiling finish. This stage is one of the most "filthy" phases of the repair work.
One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this first off since dirt and dust will be unallowable during following phases and it is forbidden at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is required to load them instantly in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is circuitry. Circuitry can be set up in walls or along the flooring. Electrical wiring is made inside the pipelines to guarantee electrical security and increase dependability. The pipeline secures electrical wiring from external damages and allows to replace the wire completely without breaking walls and flooring simply by inserting the new wire rather of the old one.
House Painting follows the electrical wiring. The regular error during the synchronised conducting of such works occurs when workers forget to lay out among the cable televisions and house painters have currently plastered and ravelled the wall. As an outcome, additional works are required to seal chases on the completed wall. The locations of the feed switch and wall outlet area and their number should be thought-out beforehand. The scheme of power electrical wiring is usually consisted of into the style project.
Later on the system need to be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are laid out. The power cable must not be set out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most peculiar moment is laying out the TV cable television. In order to make two (or 3) television set in the house the 2nd cable is frequently just "securely soldered" in parallel, so the cable resistance is reduced. As an outcome, the screen quality is deteriorated, lots of programs can't be gotten and etc. In order to avoid such scenario it is required to welcome an expert with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is conducted all at once in all facilities, if it is possible. Hold-ups are related to the innovation. Each used layer of the plaster (or filling in finishing) must dry totally before the work will continue.
Works in hygienic arrangements and the kitchen area begin concurrently with house painting. It is much better to fulfill so-called "dirty" works in the first place and all at once. In accordance with the plan of the sanitary specialist place welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then works in hygienic arrangements are performed according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.
After electrical wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface area look. The surface puttying of walls is carried out simultaneously. The highly precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument professional top plumbers that determines wetness of the material.
The following phase is the process of fill. Fill can be made with various materials-- from typical masonry cement-sand mixture to self-aligning floorings. The benefit of the basic mix is its cheapness, the drawback is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next stage of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more expensive, but more technological. Aligning takes place almost "automatically" i.e. fluid service of mix is put out, then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is installed into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry lining up (the fill innovation) is used bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors need to take into the account thickness of future floor covering. After setup the door can be removed its hinges and removed till the end of repair or packed into polyethylene film to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile needs to be laid on the definitely dry overlay.
Finishing of the flooring mounting depends on the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In properties where finish covering of the flooring is laminated flooring or parquet stockpile, the normal wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.
If finish covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned repercussion is connected only with such rushing procedure when the terrific amount of dust is created. In spite of the reality that excellent flooring grinders are equipped with the vacuum cleaner, the enough amount of dust is precipitated on surrounding topics consisting of walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be finished. It is left only to install the plinths, decorative aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the sequence of works was listed in general and can change depending upon the guaranteed scenario-- the variety of spaces in property, your resources, peculiarities of the building of the multilevel properties. It is based upon good sense and everyone capable of analysis can separately create such a series.